Investigation is necessary. According to Wang Li's requirement, how much gravity is needed for your ropeway and how much speed is needed for the ropeway transporter.
These determine the number and distance of ropeway brackets.
Lin Lengyu participated in the calculation, that is, the thirteen districts, and the maximum transport capacity needed in the future.
Finally, the maximum load-bearing capacity of the ropeway is determined. On the top of the ropeway, six transport cable cars are designed.
After the plan was handed over to the person in charge, the person came to pat his chest and said that it was not difficult, but it was difficult, how to transport the...